Introduction
More Grow Group medical equipment services can be discussed as part of a healthcare facility’s wider approach to equipment maintenance planning.
A preventive maintenance schedule identifies what work each device requires, when it is due and who is responsible for completing it. It should connect equipment records with manufacturer instructions, operating conditions and service history.
A hospital with several departments may need a different scheduling arrangement from a small clinic with a limited equipment inventory.
For facilities considering support from More Grow Group Fiji, preparing an accurate asset list and identifying existing maintenance requirements provides a useful starting point.
1. Identify the Medical Equipment Clearly
Begin with an equipment inventory that allows each device to be identified individually.
Similar-looking devices may have different maintenance procedures, accessories and service requirements.
Equipment Details to Include
- Equipment description.
- Manufacturer.
- Model number.
- Serial number.
- Internal asset number.
- Department.
- Current location.
- Installation date, where available.
- Equipment owner or responsible contact.
- Current operating status.
- Relevant accessories.
- Available operating and service manuals.
Check the inventory against the equipment physically present.
Identify devices that have moved, been retired or entered service without being added to the records.
2. Explain How Each Device Is Used
The maintenance team needs to understand the work the equipment supports.
Two devices of the same model may experience different workloads or environmental conditions.
Application Information to Record
- Clinical or laboratory function.
- Department using the equipment.
- Frequency of use.
- Operating hours or cycle counts, where available.
- Whether the device is portable or fixed.
- Whether it moves between departments.
- Typical operating environment.
- Availability of replacement equipment.
- Relevant manufacturer operating restrictions.
Describe the actual use rather than relying only on the model number.
This information helps the responsible technical team review scheduling priorities and identify conditions requiring further assessment.
3. Obtain the Manufacturer’s Maintenance Instructions
Use the applicable manufacturer documentation to establish the maintenance tasks and intervals.
A general checklist should not replace the instructions for the specific model.
WHO’s laboratory equipment guidance describes preventive maintenance as scheduled activities such as cleaning, adjustment and component replacement, with defined responsibilities and written procedures. extranet.who.int
Documents to Review
- Operating manual.
- Service manual.
- Preventive maintenance checklist.
- Installation and acceptance records.
- Manufacturer service bulletins.
- Applicable safety notices.
- Approved accessory information.
- Warranty conditions.
- Existing service agreements.
Confirm that the documents match the equipment model and relevant configuration.
Where instructions are missing, seek suitable technical guidance before creating a maintenance procedure.
4. Establish the Maintenance Interval for Each Task
Maintenance requirements may depend on elapsed time, operating hours, cycle counts or another manufacturer-defined trigger.
Different tasks on the same device may have different intervals.
Information to Confirm
- Manufacturer-recommended interval.
- Task-specific scheduling trigger.
- Date of the previous completed service.
- Operating-hour or cycle reading.
- Next due date or threshold.
- Relevant service history.
- Applicable facility requirements.
- Person authorised to approve the schedule.
Hypothetical Example
A device’s instructions specify a technical service after a defined period or operating-hour threshold, whichever occurs first.
The schedule records:
- Last completed service date.
- Operating hours at that service.
- Calendar-based due date.
- Operating-hour threshold.
- Responsibility for checking usage.
The team monitors both triggers.
Do not assume that every medical device should receive the same annual maintenance interval.
5. Review Equipment Criticality and Failure Consequences
A maintenance programme should help the facility identify which missed tasks require urgent attention.
Review the consequences of equipment failure with the responsible clinical and technical teams.
Factors to Consider
- Function performed by the equipment.
- Potential consequences of failure.
- Whether a fault may remain unnoticed.
- Availability of backup equipment.
- Frequency of use.
- Previous failures.
- Time required to obtain repairs.
- Manufacturer requirements.
- Applicable facility policies.
Use this assessment to support scheduling priorities and escalation.
Any departure from manufacturer instructions requires an appropriately authorised technical assessment and consideration of applicable requirements. A risk score alone is not a reason to extend an interval.
6. Separate User Checks From Technical Maintenance
Routine user activities and specialist maintenance should have clear boundaries.
Staff may be responsible for checks described in the operating instructions, while technical servicing may require trained personnel, specialist tools or manufacturer authorisation.
Responsibilities to Distinguish
- Before-use checks.
- Routine cleaning.
- Accessory inspection.
- Operator-replaceable items.
- Scheduled technical servicing.
- Performance verification.
- Calibration, where required.
- Applicable safety testing.
- Fault investigation.
- Repairs.
Document who may perform each activity.
Do not assign internal adjustments, electrical testing or component replacement to staff without the required competence and authority.
7. Define the Tasks Included in Each Service
A calendar entry stating “maintenance due” does not explain what work is required.
Connect each scheduled activity with an approved procedure or checklist.
Task Details May Include
- Procedure reference and revision.
- Equipment identification.
- Required inspection activities.
- Manufacturer-specified servicing.
- Relevant replacement parts.
- Functional checks.
- Measurement or performance tests.
- Acceptance criteria.
- Required tools and test equipment.
- Documentation requirements.
Not every device requires every activity.
Calibration, preventive maintenance and repair are distinct activities. Confirm their inclusion individually rather than assuming a service visit covers all three.
8. Review Equipment Condition and Known Problems
The schedule should include a way to report faults between planned visits.
A device showing damage or unexpected behaviour may require assessment before its next maintenance date.
Conditions to Report
- Error messages.
- Unexpected shutdowns.
- Inconsistent operation.
- Damaged cables or connectors.
- Physical damage.
- Battery problems.
- Unusual noise or overheating.
- Failed user checks.
- Missing accessories.
- Recurring faults after repair.
Follow the facility’s procedure for restricting or removing equipment from use when a concern is identified.
Do not treat a future maintenance booking as approval to continue using a potentially faulty device.
9. Provide Previous Maintenance and Test Records
Historical records help the technical team understand what work has already been completed.
They can also reveal repeated faults or unresolved recommendations.
Useful Records Include
- Previous maintenance reports.
- Repair history.
- Calibration certificates, where applicable.
- Performance-test results.
- Applicable safety-test records.
- Parts replacement history.
- Battery replacement records.
- Equipment downtime.
- Outstanding recommendations.
- Previous restrictions on use.
Review whether the equipment’s use or configuration has changed since the last service.
A previous checklist should not be repeated automatically if it no longer matches the device or its requirements.
10. Explain Whether Onsite Service Is Required
Some devices can be transported to a service location. Others may be fixed in place or difficult to remove.
Identify the preferred arrangement and ask the provider to confirm what can be completed.
Onsite Information to Provide
- Full facility address.
- Department and equipment location.
- Site contact.
- Access arrangements.
- Available working space.
- Relevant utilities.
- Infection-control requirements.
- Induction requirements.
- Planned equipment downtime.
- Suitable service dates.
Confirm whether all required tests can be performed onsite.
Where equipment must leave the facility, include collection, transport and return arrangements in the plan.
11. Include Transport and Location Details Within Fiji
Facilities operating across several sites should identify each location separately.
Inter-island transport, access arrangements and parts delivery can affect service planning.
Logistics Questions to Resolve
- Where is each device located?
- Can several assets be serviced during one visit?
- Who arranges transport?
- What packaging is required?
- Are special handling arrangements needed?
- Will equipment need to leave the island?
- Are replacement devices available?
- What happens if transport is delayed?
Discuss fragile, heavy or sensitive equipment before arranging movement.
Transport planning should support the maintenance schedule without concealing overdue work.
12. Coordinate Service Dates With Clinical Availability
Agree when equipment can be released for maintenance.
Scheduling several essential devices for the same period may leave a department without sufficient operational capacity.
Scheduling Information to Share
- Maintenance due dates.
- Expected service duration.
- Department operating hours.
- Suitable downtime windows.
- Backup equipment availability.
- Planned shutdowns.
- Technician availability.
- Parts availability.
- Transport time.
- Conditions affecting return to service.
Stagger work where necessary and confirm arrangements with the department.
A preferred booking date should not automatically replace the established maintenance due date.
13. Explain Cleaning and Safety Requirements
Equipment must be prepared for safe handling before maintenance.
The responsible facility team should identify relevant contamination and other hazards.
Information to Discuss
- Cleaning requirements.
- Decontamination completed.
- Required declarations.
- Biological contamination concerns.
- Chemical residues.
- Stored energy.
- Pressurised components.
- Damaged batteries.
- Special handling restrictions.
Follow the manufacturer’s instructions and facility procedures.
Technical isolation, disassembly and hazardous servicing activities should be performed only by appropriately competent personnel.
14. Assign Approval and Escalation Responsibilities
A schedule needs clear ownership.
Assign responsibility for monitoring due dates, arranging access, approving additional work and reviewing completed reports.
Responsibilities to Allocate
- Maintaining the asset register.
- Monitoring calendar and usage triggers.
- Booking service visits.
- Informing departments.
- Preparing equipment.
- Approving quotations.
- Authorising additional repairs.
- Reviewing service findings.
- Escalating overdue work.
- Authorising return to use.
If maintenance cannot be completed, record the reason and escalate it under the facility’s policy.
Do not mark a task complete because a visit was booked or an invoice was received.
15. Review Completion Evidence and Update the Schedule
After maintenance, compare the report with the planned work.
Confirm that any failed checks or outstanding actions have been addressed appropriately.
Completion Details to Review
- Correct asset identification.
- Service date.
- Procedure used.
- Tasks completed.
- Test results.
- Applicable acceptance criteria.
- Parts replaced.
- Unresolved faults.
- Restrictions on use.
- Technician details.
- Return-to-use decision.
- Next due date and its basis.
WHO describes maintenance management systems as a way to connect equipment inventories with service history, preventive maintenance procedures and performance information. who.int
A spreadsheet or maintenance system is useful only when records are kept current.
A Practical Preventive Maintenance Schedule Checklist
| Review area | What to confirm |
| Equipment identity | Description, manufacturer, model and serial number |
| Asset reference | Unique internal identification |
| Location | Facility, department and current position |
| Application | Equipment function and operating conditions |
| Instructions | Applicable manufacturer documents |
| Tasks | Approved procedure and checklist |
| Interval | Calendar, usage or other defined trigger |
| Previous service | Completion date and relevant usage reading |
| Next due | Date or threshold with documented basis |
| Responsibility | Department owner and service provider |
| Resources | Parts, tools and suitable test equipment |
| Availability | Downtime and backup arrangements |
| Safety | Cleaning and handling information |
| Results | Completed work and test evidence |
| Follow-up | Outstanding actions and escalation |
| Return to use | Authorised decision and any restrictions |
Hypothetical Example: Planning Maintenance for a Fiji Clinic
A Fiji clinic maintains patient monitors, examination equipment and several portable medical devices.
Its existing diary contains service dates, but some entries do not identify the asset or explain which tasks are required.
The clinic reviews the records before arranging its next service visit.
The Improved Schedule May Include
- A unique asset number for every device.
- Manufacturer and model details.
- Current department and location.
- Applicable maintenance instructions.
- Task-specific intervals.
- Previous service reports.
- Calendar and usage-based due triggers.
- Known faults requiring separate investigation.
- Backup equipment arrangements.
- Required parts.
- Responsible contacts.
- Completion and return-to-use records.
The clinic then groups suitable work into planned visits while preserving each device’s individual due requirements.
This example is illustrative. Appropriate tasks and intervals depend on the equipment, manufacturer instructions and authorised facility procedures.
What Should Be Included in a Maintenance Proposal?
A useful proposal should connect the service with the assets and tasks identified in the schedule.
Request Written Details Of
- Equipment covered.
- Maintenance procedures.
- Visit frequency.
- Applicable usage triggers.
- Inspections and tests included.
- Calibration scope, where required.
- Parts and consumables included.
- Service location.
- Expected downtime.
- Reporting arrangements.
- Technician competence and relevant authorisation.
- Exclusions.
- Additional-work approval process.
- Transport responsibilities.
- Follow-up arrangements.
Ask how incomplete tasks and unexpected findings will be reported.
Confirm whether repairs, emergency callouts or specialist subcontracted work require separate approval.
Common Preventive Maintenance Scheduling Mistakes to Avoid
- Maintaining dates without an accurate asset list.
- Applying one interval to every device.
- Ignoring operating-hour or cycle triggers.
- Using procedures for the wrong model.
- Treating user checks as technical servicing.
- Assuming calibration includes all maintenance.
- Scheduling essential devices without backup arrangements.
- Omitting cleaning and handling information.
- Moving due dates without an authorised review.
- Marking booked work as completed work.
- Returning equipment to use with unresolved findings.
- Failing to update records after repairs or relocation.
Clear ownership and complete records help facilities identify what is due and what remains unresolved.
Discussing Maintenance Requirements With More Grow Group Fiji
When discussing More Grow Group medical equipment services, provide an equipment list and explain the maintenance support your facility requires.
Ask the team to confirm capability for the specific manufacturers, models and tasks involved.
Information to Share Includes
- Equipment descriptions and quantities.
- Manufacturer, model and serial numbers.
- Internal asset references.
- Facility and department locations.
- Manufacturer maintenance instructions.
- Existing due dates.
- Operating hours or cycle counts, where relevant.
- Previous service records.
- Known faults.
- Onsite or offsite preferences.
- Backup equipment arrangements.
- Reporting and approval requirements.
Confirm the available service scope, parts support and scheduling arrangements before accepting a proposal.
Building a Maintenance Schedule Around Equipment Needs
A preventive maintenance schedule should explain more than when the next visit is planned.
Identify each device, connect its tasks with the applicable instructions and monitor calendar or usage-based requirements. Assign responsibilities and retain evidence of completed work.
For facilities discussing support with More Grow Group Fiji, this information helps establish a practical service scope and a clearer process for managing equipment availability.